If units of the Scheme are redeemed/switched -out within 12 months from the date of allotment:
Upto 10% of the units: No exit load will be levied
Above 10% of the units: exit load of 1% will be levied
If units of the Scheme are redeemed/switched -out after 12 months from the date of allotment. No exit will be levied.